Locomotive Transport

Maryborough to Gladstone



Case Study 2 - Locomotive Transport

STEP 1 - LIFT ENGINEER

Careful Planning and Detailed Engineering

Calculate Load and Required Lashings to protect asset.

STEP 2 - TRANSPORT

Transport of 85 tonne locomotive from Maryborough to Gladstone

STEP 3 - UNLOADING

Unloading locomotive using 450 tonne Lift N Lock Hydraulic Gantry

STEP 4 - ASSEMBLY

Final placement onto Bogeys.

Gantry System provided excellent control.

STEP 5 - PROJECT SUCCESS
 
 