Case Studies.
Case Study 1.
7D Radial Stacker Replacement
Peak Down Mins
Case Study 2.
Locomotive Transport
Maryborough to Gladstone
Case Study 2 - Locomotive Transport
STEP 1 - LIFT ENGINEER
Careful Planning and Detailed Engineering
Calculate Load and Required Lashings to protect asset.
STEP 2 - TRANSPORT

Transport of 85 tonne locomotive from Maryborough to Gladstone
STEP 3 - UNLOADING


Unloading locomotive using 450 tonne Lift N Lock Hydraulic Gantry
STEP 4 - ASSEMBLY


Final placement onto Bogeys.
Gantry System provided excellent control.
STEP 5 - PROJECT SUCCESS