ECR Heavy Haul
-
The transformer is being prepared for transport
Equipment: Goldhofer 12-axle self-propelled trailer
-
Project: Transportation of the new Areva Transformer to site
Equipment: Goldhofer 12 axle self-propelled trailer
-
Project: Manoeuvring the transformer into position according to the engineering plan.
Equipment: Goldhofer 12 axle self-propelled trailer
-
Project: Old radial stacker truss at Peak Downs being loaded for transport.
Equipment: Goldhofer 18 axle self-propelled trailer; 280 Tonne Crawler Crane
-
ECR heavy transport fleet
-
Project: Preparing to transport an 85 tonne diesel locomotive
Equipment: Goldhofer 12 axle trailer with drawbar
-
Project: On the road to Callemondah from Maryborough.
Equipment: Goldhofer 12 axle trailer with drawbar
-
Project: Arriving on site at Callemondah and preparing to unload locomotive.
Equipment: Lift ‘n’ Lock Hydraulic Gantry System
-
Project: On site transport relocation of Moura dump station
Equipment: Two Goldhofer 12-axle trailers.
-
Project: Preparing to move the rotary kiln into position at Yabulu Nickel Site, Townsville.
Equipment: Goldhofer trailers
-
Project: On the road to Callemondah from Maryborough.
Equipment: Goldhofer 12 axle trailer with drawbar
-
Project: Arriving on site at Callemondah and preparing to unload locomotive.
Equipment: Lift ‘n’ Lock Hydraulic Gantry System