ECR Heavy Lift
-
Project: Completed assembled stacker for Krupp
Equipment: 350 Tonne Crawler Crane
-
Project: Loading 170 tonne transformer onto the Goldhoefer self-propelled trailer
Equipment: Lift 'n' Lock Hydraulic Gantry System
-
Project: Lifting the 170 Tonne transformer off the Goldhoefer Trailer using Gantry System. This photo recently appeared in Cranes and Lifting Magazine.
-
Project: 170 Tonne transformer being lifted into final position
Equipment: Lift 'n' Lock Hydraulic Gantry System
-
Project: Assembled Peak Downs Radial Stacker lifted off Goldhoefer trailer.
Equipment: 280 Tonne Crawler Crane
-
Project: Stainless steel tank being moved on site at Orica in Gladstone
Equipment: Goldhofer self-propelled trailer and the Grove 130T All Terrain Crane
-
Project: Replacing drag drum gearbox in the Bowen Basin
Equipment: 280 Tonne Crawler Crane
-
Project: Moura Dump Station being loaded onto the Goldhoefer trailer
Equipment: 280 Tonne Crawler Crane
-
Standing the boom at Port Hedland, Pilbara WA.
Equipment: 350 Tonne Crawler Crane
-
Project: Replacing drag drum gearbox in the Bowen Basin
Equipment: 280 Tonne Crawler Crane
-
Project: Moura Dump Station being loaded onto the Goldhoefer trailer
Equipment: 280 Tonne Crawler Crane
-
Standing the boom at Port Hedland, Pilbara WA.
Equipment: 350 Tonne Crawler Crane