Technical Engineering
-
Photo of lashing plan for diesel locomotives
on the back of the 12 axle Goldhoefer trailer.
-
The plan for lifting the 170 tonne transformer
off the back of the 12 axle self-propelled trailer.
-
Photo of actual setup of Lift’n’Lock Hydraulic Gantry System
in preparation for installation of Areva transformer.
-
Engineering workings to ensure the
installation of transformer went smoothly and to plan.
-
Engineering drawings done in preparation for
locomotive lift using Lift’n’Lock Hydraulic Gantry System.

